3

I am currently into an estimating job for a small construction company. In my previous experiences, in calculating the labor cost for a certain job,

Labor cost = material cost * 0.45

I did this to simplify the computation. Are there any other specific labor factor for different job classification for the following class:

  1. concreting
  2. masonry
  3. carpentry
  4. painting
  5. steel
  6. rebars, etc.

that I can adopt?

Note: This will not involve equipment in the process.

Jem Eripol
  • 850
  • 5
  • 16

1 Answers1

2

In the Philippines, there are 2 types of labor rates that we consider. We have provincial and non-provincial rates.

For non-provincial rates, we can go as far as 45% material cost, while on provincial rates, we only go up to 35% of the material cost. This is due to our present labor rules and regulations (which i hope should be changed soon).

But the above percentage varies according to the difficulty of work, e.g. painting and carpentry requires a lot of skills than concreting that's why I sometimes go as much as 60% for these type of jobs.

Hope this helps.

Jem Eripol
  • 850
  • 5
  • 16