What we learn in engineering school is often idealistic, with textbook examples showing typical prismatic steel beams with a plastic section classification or excavation in a perfect sand or clay geology. However, in the real world nothing is perfect and engineers will face complex problems not taught in school, where there is little referencing literature and where the design codes do not provide clear guidelines.

One of the tasks I was assigned when I started out as an engineer was to design cofferdams for both abutments of a river bridge with a 30 degree skew across the river due to site constraints. As a result, the abutments at both side of the river are skewed. As a designer for the contractor, often we do not get to dictate the shape of the excavation. Material cost is always a source of great consternation, even more so in temporary works design.

I built a 2D frame for each strut level to do a structural analysis for the odd-shaped cofferdam. However, as the excavation is on a 35 degree slope, the sheet pile wall on the land side has greater lateral earth pressure than the river side. Also, due to the parallelogram shape, I have difficulty balancing the forces.

cofferdam strutting arrangement for an abutment

How should you model the boundary conditions for such an irregularly-shaped cofferdam, where the lateral earth pressure acting at the strut level is not balanced?

Air
  • 3,211
  • 4
  • 26
  • 47

1 Answers1

2

Unbalanced Forces

As you noted, the unbalanced soil heights and the skew create unequal forces in the struts. This is likely going to turn the short side into what is effectively a deadman.

The short side will be pushing into the soil. This can mobilize the soil's passive resistance. Since passive resistance is greater than active soil forces, it may be more conservative to assume this lower active force. Also, the short wall may not deflect enough to mobilize the passive pressure.

Modeling

Actually modeling the entire excavation will require using cantilever piles. The excavation can't be just a rigid box since the forces are uneven. The piles will need to mobilize some of the passive reaction of the soil below the excavation.

The forces on the two opposite walls will need to be balanced. These forces can then be used to design the strut frame. The interaction of the opposite walls of the excavation and the soil is not linear, so this will not be easily converted to simple boundary conditions for the frame model. There is a lot of interaction between the deflections of the walls and the soil response.

Construction Staging

The differing soil heights not only create modeling complexities in the final condition, they will also create issues at every depth of excavation. This is a point that is often overlooked in design.

The sheeting or lagging has to be able to support the soil and any additional loads as the excavation progresses. It is good to know where you want a waler to be located in the final condition, but it must be safe to be able to remove enough soil to be able to instal this waler. This means that the wall will be exposed down to a couple of feet below the waler location.

Even somewhat standard excavations can require 6 or more separate construction phases to be analyzed.